Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Guangzhou Lifan Screen Co

Screen mesh, fence mesh, wire mesh, protective mesh, isolation mesh, fence me...

sell
  • There is no classification
contact
  • Contact:蒋岩
  • Phone:02037415910
  • Email:2976885930@qq.com
search
 
link
  • There is no link yet
home > sell > Heyuan road guardrail net, barbed wire Heyuan garden guardrail net price Heyuan guardrail net manufacturer
Heyuan road guardrail net, barbed wire Heyuan garden guardrail net price Heyuan guardrail net manufacturer
products: Views:7Heyuan road guardrail net, barbed wire Heyuan garden guardrail net price Heyuan guardrail net manufacturer 
brand: 力帆筛网
立柱: 48mm/60mm
尺寸: 订制电话 15374053248
表面处理: 浸塑|喷塑
price: 19.00元/平方米
MOQ: 1 平方米
Total supply: 999999 平方米
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2017-01-18 17:08
 
Details
Double circle double circle
Double circle guardrail product specifications
Material low carbon cold drawn steel wire
Plastic wire warp
Hole (rectangular hole)
Large size
Surface treatment: galvanized, spray-coated, dipped, etc.
Surface treatment and structure of double-circle guardrail net
The metal mesh is braided and welded with low carbon steel wire, stamped, bent and rolled into a cylindrical shape, and then connected to the steel pipe with connecting accessories The pillars are connected and fixed. Three methods of galvanizing, spraying and plastic dipping are used.
Advantages and uses of double-circle guardrail net
It has high strength, good rigidity, good appearance, beautiful appearance, wide field of view, easy installation, bright, light and practical features. The connection between the mesh and the net posts is very compact, and the overall feeling is good. The upper and lower coils make the mesh surface Significant increase in intensity. Mainly used for decorative protection of highways, airports, municipal green spaces, garden flower beds, unit green spaces, port green spaces.
Precautions for installation of double-circle guardrail net
When carrying out concrete foundation construction on guardrail columns, the construction unit shall release the center line of the foundation and perform necessary leveling and cleaning of the site in accordance with the requirements of the approved construction organization design and design drawings. Ensure that the isolation fence is beautiful and straight in shape after installation. Before foundation concrete is poured, the size of the foundation pit and the spacing between foundation pits must be inspected and approved by the supervision engineer before concrete pouring can be carried out.
During the installation process of the columns, it is necessary to ensure that the columns are stable and tightly connected to the foundation. If necessary, supports can be installed to stabilize the columns. During the column installation process, small lines should be used to detect the straightness of the column installation and make local adjustments. Make sure the straight sections are straight and the curved sections are smooth. The burial depth of the columns must comply with the requirements of the design drawings. After the construction of the columns is completed, the supervision engineer must detect the linear burial depth of the columns and the stability of the connection with the foundation. Only after meeting the requirements can the net hanging construction be carried out.
The mesh must be firmly connected to the columns. The mesh surface should be flat without obvious warping or unevenness after installation. After the construction of the isolation fence is completed, the Gao Resident Office will organize relevant personnel to inspect the quality of the guardrail network.
Request for quotation
A total of0articles  Related Comments: